The contractor shall submit detailed riser diagrams detailing point-by-point
connections. General Specification for Electrical Works Abu Dhabi Sewerage Services Company ADSSC/GSEW Division 16 Section 16010 Electromagnetic Compatibility (EMC) Rev: 02 Jan. 2011 Page 6 of 7 6. You also have the option to opt-out of these cookies. IBC (International Building Code). o
Indicate scheduling, sequencing, movement, and positioning of large equipment into the building during construction. Cure placed grout according to manufacturer's printed instructions. Sizes and location of required concrete pads and bases. INSPECTIONS
Contractor shall:
Schedule, pay for (as applicable) and attend all inspections required by the Authorities Having Jurisdiction. Make all necessary investigations as to locations of utilities and all other matters which can affect the work. See underlined texts for Edits. 0
0000002809 00000 n
The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. Where coordination requirements conflict with individual system requirements, refer conflict to UMB. Training period shall be performed within one (1), two (2) week period. This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. Remove and replace Work not conforming to requirements of the Contract Documents. All communication shall be through this person. %PDF-1.6
%
Machine name and specification section number of driven machine. (Engineer shall edit specifications and blue text in header to meet project requirements. Samples shall include physical examples of materials; in complete units for visual inspection. Timkens deep groove ball bearings deliver reliable performance in a wide range of applications and conditions. The work plan must include procedures to be used on and near the live electrical equipment, barriers to be installed, and safety equipment to be used and exit pathways. _^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! Provide an index chart for identification. %%EOF
Economy and efficiency adjustments. %PDF-1.5
%
1835 0 obj
<>/Filter/FlateDecode/ID[<436FD37774A5B745BAA68B131E232EA6>]/Index[1820 93]/Info 1819 0 R/Length 81/Prev 195435/Root 1821 0 R/Size 1913/Type/XRef/W[1 2 1]>>stream
Avoid air entrapment when placing grout. Contractor shall furnish manufacturer's electrical equipment of the types and sizes specified which has successfully operated for not less than the past two years, except where specific types are named by manufacturer and catalog number or designation under other Sections of the Contract Documents. With super-finished raceways and controlled geometries, our premium design helps ensure consistent quality. 16010 - 1 . 3 electrical and mechanical specifications, specifications for electrical unit substation . 4206 0 obj
<>/Filter/FlateDecode/ID[<3C9B520689C7864B9A48B04B8892C8F0><70969F182CD17F458CE0C92FB6F87795>]/Index[4188 97]/Info 4187 0 R/Length 96/Prev 405976/Root 4189 0 R/Size 4285/Type/XRef/W[1 3 1]>>stream
@ B F G c h j ~~vi^S~Hh"S{ h0$n CJ aJ hf h;F B* Each section of raceway must contain an equipment grounding wire bonded at each end and sized as required. Preliminary programming information. Mandatory Requirements: The following requirements are mandatory:
Protective Equipment: Electricians must use full protective equipment (i.e., certified and tested insulating material to cover exposed energized electrical components, certified and tested insulated tools, etc.) 11282 0 obj
<>stream
By closing this banner, or continuing to use this website, you consent to the use of cookies. Mix grout according to manufacturer's printed instructions. PROJECT OPERATION AND MAINTENANCE MANUAL ELECTRONIC FILES
Project O & M Manual File: The project OM Manual shall include one (1) electronic copy of each approved submittal and any manufacturers maintenance manuals, and all warranty certificates included in Divisions 26, 27, & 28. <>>>
As part of instruction for operating equipment, demonstrate the following procedures:
Start up. Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." If you want to know more or to change your cookie settings on your computer or device, please see our cookie policy. Related Specification Sections include, but are not limited to, the following: 1. endstream
endobj
2010 0 obj
<>stream
8 d X 6 D Z Z Z Z r" T " " $ D " 2" 2" @ " " Z Z 6% 6% 6% " F Z Z 6% " 6% 6% " l C Z F4 8# 3 v ( 0 X # C C P 0 " " 6% " " " " " $ " " " X " " " " " " " " " " " " " X f : SECTION 260000 BASIC ELECTRICAL REQUIREMENTS
Latest Update 03-10-2022. SECTION 16010 - GENERAL PROVISIONS 1.0 GENERAL CONDITIONS: All sections under this Division shall be subject to the requirements of the Architect's General Conditions - UAP Doc. Necessary cookies are absolutely essential for the website to function properly. Housekeeping Pads: Pads shall be minimum of four (4) inches wider and longer than structural base of equipment being set on pad. EQUIPMENT PROVIDED UNDER ANOTHER DIVISION AND BY OTHERS
The Installer of products under Divisions 26, 27, & 28 shall make all system connections required to equipment furnished and installed under another division and by others. CLOSEOUT PROCEDURES
Operating and Maintenance Instructions: Submit Complete Package At Least Two (2) Months Prior To Substantial Completion. Section 16010 General Electrical Provisions Section 16120 Wire and Cables Section 16130 Wiring Devices Section 16160 Pilot Devices . Before initiating any work, a job specific work plan must be developed by the contractor. 4 0 obj
We also use third-party cookies that help us analyze and understand how you use this website. For equipment rough-in requirements see specifications for electrical equipment. Adjustment. Shut down. B. This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . 4188 0 obj
<>
endobj
Supplementary Conditions and Division-1 Specification Sections, apply to this Section. mHs00\%Q` Coordinate installation of identifying devices after completing covering and painting where devices are applied to surfaces. 0000005420 00000 n
service companies, and controlling agencies. %PDF-1.5
%
In addition to the requirements specified in Division 01, indicate the following installed conditions:
Conduit and wire runs between the points
Equipment locations (exposed and concealed), dimensioned from prominent building lines. English Deutsch Franais Espaol Portugus Italiano Romn Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Trke Suomi Latvian Lithuanian esk . 0
endstream
endobj
startxref
These cookies will be stored in your browser only with your consent. 1.2 REQUIREMENTS OF REGULATORY AGENCIES AND STANDARDS %PDF-1.5
%
OSHA (Occupational Safety & Health Act). SITE VISIT
Prior to preparing the bid, the electrical subcontractor shall visit the site and become familiar with all existing conditions. Narrow Section Ball Bearings (16000, 16100). Each and every punch list item shall be initialed and dated by the Contractor when the work is complete. Install systems, materials, and equipment giving right-of-way priority to systems required to be installed at a specified slope. The lighting design shall have a cross-section of 2,5 mm and a circuit breaker of (1 x 10 A + N) - Minimum wire size shall be 2.5 mm. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. Remove all electrical clippings, wiring, nuts, bolts, etc. 878 0 obj
<>
endobj
Listing and Labeling: Provide products specified in this Section that are listed and labeled. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Place grout on concrete bases to provide a smooth bearing surface for equipment. APPROVED EQUAL EQUIPMENT LAYOUTS
Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. %PDF-1.6
%
It shall be the responsibility of the Installer to obtain all necessary data from the equipment supplied under other Divisions. 6glqqS6&2S0gW Before shipment, the power distribution panel boards, shall be tested to ensure proper operation and conformance with manufacturer's published specifications. @W|$" CA-1817 / PN15160009 16010 - 1 DIVISION 16 - ELECTRICAL SECTION 16010 - GENERAL ELECTRICAL PROVISIONS PART 1 - GENERAL 1.01 INTENT OF SPECIFICATIONS AND DRAWINGS A. SUBMITTALS
General: For general requirements see Architectural Specification Division 01 Section "Submittal Procedures". RELATED SECTIONS SECTION Title 14200 Conveiance System 16000 Electrical Works 16010 General Provisions for Electrical Work 16110 Raceways 16120 Conduits 16200 Cables and Wires 16300 Supporting Devices 16400 Main Distribution Equipment 16500 Lighting ph p he h;F B* Deep groove ball bearing. Job site and worker safety are the responsibility of the contractor. YKY%+~GPtWx@@nZJ |9!H!7/"-m_1H0Nb+y State of Maryland Fire Prevention Code. PART 3 EXECUTION
ROUGHIN
Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected. The Engineer shall decide on the item and manner in which the work shall be provided. service companies, and controlling agencies. hbbd``b`q @`W@qD%XAWH12N@ M
Coordinate the installation of required supporting devices and set sleeves in poured in place concrete and other structural components as they are constructed. Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. All such outages shall be performed on other than normal duty hours. endobj
PART 1 - GENERAL . PART 1 - GENERAL . endstream
endobj
startxref
Also include the address, phone number and contact person for each supplier. Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. 16010. G.|,b43f`0pXaE"zs aN
Shop drawings detailing fabrication and installation requirements for electrical equipment. P}a
WNd|2Svk=vq!xKv!`,8h@
` 8`M9e D `TD>'5m4dZppSs$+{43 ]EY All work in Divisions 26, 27, and 28 shall comply with the latest version of following codes and regulations as adopted by the State of Maryland and the State Fire Marshal, unless otherwise specified. hbbd```b``+XLVH&06K 0&_d9;H2b&Ff=~ 90
11-254
95% Construction Document Submission Phase January 03, 2012
BASIC ELECTRICAL REQUIREMENTS 260000
/ = > ? {s@_yj1' 3{J1tB;=6bcC. Obtain all necessary permits from Outages should be scheduled a minimum of ten (10) days in advance. hb```,G@(b``oI Install identifying devices prior to installing acoustical ceilings and similar concealment. All adjustments and modifications shall be provided by the bidder and appropriate subcontractors at no additional cost to the project. WORK PERFORMANCE
All electrical work must comply with the requirements of NFPA 70 (NEC), NFPA 70B, NFPA 70E, OSHA Part 1910 subpart J, OSHA Part 1910 subpart S and OSHA Part 1910 subpart K in addition to other references required by the contract. while working on energized systems in accordance with NFPA 70E. %%EOF
PART 1 GENERAL
RELATED DOCUMENTS
Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section and all other Electrical Specification Sections. NECA (National Electrical Contractors Association). Obtain all necessary permits from Prospective subcontractors under this section are cautioned that the unauthorized operation of electrical equipment or other control devices by their personnel can result in extremely serious consequences for which the contractor will be held accountable. Patch, repair and repaint all walls and surfaces cut, penetrated or otherwise disturbed by the work. The work to be done under this Division of the specifications consists of the fabrication, complete in all details, of the Electrical Work, at the subject premises, and all work and materials incidental to the proper completion of the installation, except those portions of the work which are expressly stated to be done by others. Unless otherwise indicated in each specification section, contractors may submit material and equipment by non listed manufacturers provided said submittals meet the requirements of these specifications. Provide forms for placement of grout, as required. 2020 0 obj
<>stream
The layered electronic files shall allow building elements, building systems and sub systems to be viewed in isolation or in combinations that are user selectable when the drawing files are being displayed. Disconnect installed work as specified for testing. It is mandatory to procure user consent prior to running these cookies on your website. l2f71S-K#C@EM{Wtq 0000000596 00000 n
5. CONCRETE HOUSEKEEPING PADS
COORDINATE CONCRETE WORK WITH DIVISION 3. Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel]. 3 0 obj
Local or State license where required. FINAL CLEANING
General: General cleaning during construction is required by the General Conditions and included in Section Temporary Facilities. The electrical installer shall utilize a full time project foreman in charge of all electrical work. 16 ELECTRICAL GENERAL REQUIREMENTS Section 16010 Refer to specification Section 16010 - "Basic Electrical Requirements: for complete work scope. Place grout around anchors. 0
Coordinate connection of electrical systems with exterior underground and overhead utilities and services. Provide larger trim or cover plates for new devices, where old back boxes, holes, etc. Div. 1.08 TESTING A. Place markers in corner of tile. %%EOF
Schedule the preliminary and rough-in inspections in a timely manner. 3. All submitted materials and equipment are subject to approval by the A/E and UMB. trailer
Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are of importance to the efficient flow of the Work, including (but not necessarily limited to) the following:
Indicate the proposed locations of electrical equipment, and materials. <>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 595.44 841.68] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
<>
Both riser and floor plan shall indicate address of devices where applicable. provided by the general contractor and/or his subcontractors shall be guaranteed and warranted to be free from defects in workmanship and materials for a period of two (2) years after date of certificate of completion and acceptance of work by UMB. 4. PROTECTION OF WORK
Protect work, material and equipment from weather and construction operations before and after installation. endstream
endobj
879 0 obj
<. It is the responsibility of the Contractor and its subcontractors to review all sections and ensure a complete and coordinated project. This instruction period shall consist of not less than five (5) eight (8) hour days. Remove conduit, hangers, supports, etc. Compliance with the requirements of NFPA 70E is subject to ongoing inspection by University personnel and failure to comply will result in an immediate Stop Work order being issued and enforced at the contractors expense. EU PRODUCT DIRECTIVES a) The EU Product Directives deal with large families of products or horizontal risks, such as those addressed in the Electromagnetic 264 15
endobj
endstream
endobj
575 0 obj
<>stream
?\
2j0D,xl>Kc2)b01UBu0% ## d X%XIL Electrical Performance Specifications Skagway Bazaar Building - Skagway, Alaska Page 1 of 10 . The hot work permit copy shall remain on the job site at the hot work location until such work is completed at which time the permit shall be returned to Environmental Health and Safety. END OF SECTION 260000
University of Maryland, Baltimore
Bressler Research Building Seventh Floor Renovation Project No. c $
)
p@P ! 0
L1)Tj4d v"1s%H"r$-j` ,}# hbbd``b` $Z ~BARD0 !LAF10t' Access doors. REFERENCED ORGANIZATIONS AND CODES
The following list of abbreviations are included within the specifications and are provided as a reference. PROJECT PUNCH OUT
Architect/Engineer will perform punch out reviews and will provide the Contractor with a list of punch list items to be completed before contract close out. Coordination Effort: This coordination effort shall include detailing major elements, components, and systems of electrical equipment and materials in relationship with other systems, installations, and building components. Shop Drawings: pdf file format. 1.1 GENERAL REQUIREMENTS: A. Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. For equipment requiring seasonal operation, perform instructions for other seasons at the same time. J{H5*aQDi!=GcN`H%{`8Zky:qr\a! Verify all dimensions by field measurements. REPAIRS & RESTORATION OF SURFACES AND FINISHES:
Restore all finishes, equipment and surfaces to original condition, where affected by the work. All other materials removed shall become the property of the Contractor and shall be removed from the premises. 1912 0 obj
<>stream
Install electrical equipment to facilitate servicing, maintenance, and repair or replacement of equipment components. Work with the other trades to ensure the material and equipment installed as part on the electrical system will not be in conflict with the installation of material and equipment by the other trade contractors. vol. Power Distribution System. Coordination Drawings: In addition to the requirements of the Specification Division 01 prepare the plumbing part for the coordination drawing effort. In addition to the above statement the Guarantee/Warranty Period shall include all labor cost related to all warranty work. Cutting, welding and burning
Concrete housekeeping pads
Grouting
Protection of work
Provisions for access
Demonstration and instruction
Equipment provided under another division or by others
Record drawings
Closeout procedures
Inspections
Demolition
Repairs and restoration of surfaces and finishes
Final cleaning
Project punchout
Summary of Work:
Provide a complete integrated electrical system in accordance with the intent of
these specifications and the accompanying drawings. 571 0 obj
<>
endobj
Motor manufacturer, motor type or model . Browse Part Number 16010, Narrow Section Ball Bearings (16000, 16100) in the The Timken Company catalog including Part Number,Item Name,Description,Clearance,Bore Size d,Features,Outside Diameter D,Outside Ring Width B,Radius Rs min,Cr - Dynamic Load SEQUENCING AND SCHEDULING
Coordinate electrical equipment installation with other building components. Installers' qualifications refer to the materials and methods required for the surface and building components being patched. Reflected ceiling plan. h. Coordinate connection of electrical services. 2013 0 obj
<>/Filter/FlateDecode/ID[<7A92318D9A66904D9BE2AA2059D48142><9E5BD34DD47A4B4CACDF0D2F3CF07D4E>]/Index[2006 15]/Info 2005 0 R/Length 55/Prev 136060/Root 2007 0 R/Size 2021/Type/XRef/W[1 2 1]>>stream
.1 .2 ANSI/IEEE 837, Qualifying Permanent Connections . .2 This shall generally include work in the following areas: specifications electrical metallic tubing (emt) t&b detailed specifications for electrical items technical specifications for electrical work, electrical specifications - mouser electronics, electrical specifications & selection guide - delco remy, 2006 introduction to electrical construction specifications, standard in progress edition electrical specifications , electrical specifications manual override, electrical specifications & selection guide, electrical accessories and specifications, specifications for electrical installations, master specifications division 26 - electrical, general specifications for electrical installations, general specifications for electrical works, installation, specifications, service, electrical diagrams. Review contents of manual and video with personnel in detail to explain all aspects of operation and maintenance. HdSMo0W(jId]6t=K"N[ #$_^K.!Ze9dV0rOV\J`F@K6c,td6_b!JUjke3UK^mSw\,}GAqsv@qhnb/mWRj+'jXo4Zg|%>S9|WVTRn'p#X18G\R%0L|["l\pzJxFqLxX#4\;c?(=;7HZ\Y6+I(1LDe[9mAMwd]U'Gh-cEIV\# ,4cJ%P)iqOD%1x1Z=. Pa>hRjf4L4)@5C'2O4)@5C'^T3}2-IT3}2-Iid>qd|'2.@5C'2& 1? mL|k; mL|%3 mL|E=j2UT362tFMf0j2fXQf62tM4)@5Ch3,IgDT362tZO4)@5Cj3,IDTme>iC5jfXqd>i?j2m4|z7j2Ou|GVvx6p+j6*|orw~~qyri{7g2a AoO{z'ZwoFOP1p(Cs&.8dnvr{x8^|\hyuba4w/Axu (p8g\n4d,K%T?Hd2nZirM0%H K
y}?3S}~I4H>_yUuSxIZ
C7F"T!5b~Q0; Identification systems. This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . Properly store and handle all materials and equipment. Time of instruction shall be designated by the Owner. Record documents. Provide service and operating manuals for the following:
Division 28 Section Digital, Addressable Fire Alarm System. 264 0 obj <>
endobj
0000001525 00000 n
NEMA (National Electrical Manufacturers Association). Safety procedures. 4. An electrical foreman, superintendent or other supervisor familiar with the project shall
be in attendance for all scheduled electrical inspections. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. NETA (National Electrical Testing Association). %%EOF
startxref
**"DHV1WtdRO2hK22K2*3e,jKs'{@Ee^hxNKK9 zBh9 Provide installation in accordance with recognized trade organizations and standards:
NEMA.
These cookies do not store any personal information. qZ*`vC+6`tth?P^u^ 'EHC1ZK$q{)Q8E In addition to the requirements specified in Division 1, the following requirements apply:
Protection of Installed Work: During cutting and patching operations, protect adjacent installations. }T+A&p~lA&K9V=Zp-8ysG.n{@K?zpW\{\ZZgZU%]M:z ^HsRoiSD-G[ 5#)\EENX6 4284 0 obj
<>stream
Perform equipment tests as indicated and directed by the manufacturer, and as specified in Section 16010 and Sections of the Specification specifying equipment and/or systems. hbbd``b`$f n2 w}L %X0 8
2.0 GENERAL DESCRIPTION: A. hmo %PDF-1.5
Do not include this data in the Product Submittals. Unless otherwise specified, outages of any services required for the performance of this contract and affecting areas other than the immediate work area shall be scheduled at least ten days (10) days in advance with the Office of Facilities Management. Where pipe sleeves are installed in non-rated CMU walls fire rated sealant materials are not required. CONCRETE HOUSEKEEPING PADS
Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. This website uses cookies to improve your experience while you navigate through the website. Existing Construction: All new service penetrations through existing rated assemblies shall be provided with a pipe sleeve and sealant materials. 0000002122 00000 n
&%`T$cf:A5H(3Jy?'- ]
Installer of specialized systems such as Fire Alarms, telecommunication systems, etc. No additional compensation will be made to the contractor as a result of his failure to familiarize himself with the existing conditions under which the work must be performed. <>
Reference letters from minimum of three (3) registered professional engineers,
general contractors, building owners, explaining proficiency, quality of work,
or other attribute on projects of similar size or substance. Housekeeping Pads: Set all floor-mounted equipment on four (4) inch high concrete housekeeping pads, unless otherwise shown or specified. Part Number 16010, Narrow Section Ball Bearings (16000, 16100). 16010 - 1 . Fire rated wall and floor penetrations.